Foundation takeoff

Set up the job, upload photos of the plans, and Claude reads the dimensions, the footing key and the rebar callouts. Every quantity is calculated from what you see on this page, and you can edit all of it.

Talk

Say the builder, subdivision, lot and block, e.g. “CBH Homes, lot 12, block 4, Valley subdivision.”

1 · Job setup

Rebar
Lot

Pour weather

Is the footing pour starting?

2 · Plan photos

Add up to 6 photos of any plan pages, in any order. Picking the page type is optional; it just helps Claude.

Or add by page type (optional):
No photos yet. The board shows a sample plan.

Tip: shoot straight on, in good light. Get the footing key and title block in frame. That's where the sizes and the city come from.

On the job takeoff
Concrete
How these were figured

On iPhone or iPad, Save opens the share sheet. Pick CompanyCam to add the PDF to the job, or Save to Files.

VPO approval form1722 Industrial Rd. Nampa, ID 83687 · C 208-412-6395

Repair

Amount adds up the repairs. Ref # is numbered automatically (0001, 0002…) and saved.

Superintendent
Sign here
Crew lead / Super
Sign here

Request signature

By email, the VPO goes out from your Gmail. By text, the message is copied for you to paste into a text. Signing on their own phone needs an e-signature service connected to Claude; until then they can sign here on your phone.

Product calculator

Floor type
Other floor
Measure the floorWalk the job with the iPhone Measure app and add each area here. Saves as you go.

Measured total0 sq ft
Floor square feet sq ft

Flake needed (sq ft ÷ 10)0 lbs

Epoxy needed (sq ft ÷ 200)0 gal
Polyaspartic needed (sq ft ÷ 150)0 gal

For 4150, 4195, 4200 and 5020, 5085, Water base. Specialty products get their own numbers below.

Fill saw cuts?
How many feet? ft
Flake size
Flake used lbs

Flake color
Other flake color

Epoxy product

Primer used?
Base color
Other color
Accelerator per gallon oz
Epoxy total0 gal

Polyaspartic product

Polyaspartic total0 gal

Supplies used & thrown away

AreaDoneSq ft
Total0 sq ft
PVC (white pipe) #
Black pipe #
Concrete yards (total sq ft ÷ 78)0 yds
Pump?
Color additive yds
Concrete additives per yard yds
Is prep good?
Prep depth in
Stamped?
Stamped sq ft sq ft
Stamp description
Stamp bands / borders LF